About this site
What Hilton Head Docks is, how requests sent through it are handled, and how its permit, tide, and building-rule facts are sourced.

What this site is
Hilton Head Docks is a planning resource for homeowners thinking about a private dock, boat lift, or shoreline project on Hilton Head Island and the nearby Lowcountry. It publishes information about permits, state dock rules, tides, and materials. It does not design or build docks, and nobody performs construction work under its name.
The site also has a request form. When you send a request, it goes to an independent local contractor, who may contact you about the project. That contractor may pay for the referral. Any quote, contract, or schedule is between you and the contractor.
Hilton Head Docks does not check contractors' licenses or insurance, and it does not supervise their work. Run your own checks before you sign. The guide to hiring a dock contractor lists what to look up and what to ask.
Where the facts come from
Permit, regulatory, and building-rule statements on this site cite the government office or law that sets the rule. Tide figures come from NOAA's tide station datums. Soil descriptions come from USDA's soil survey. Storm history comes from the National Hurricane Center.
The site keeps a claims ledger that records the source behind each factual sentence and the date someone checked it. A separate fact-check pass, not the writer, reviews each entry before it is marked verified.
How to read the tide figures
The tide ranges on this site come from NOAA tidal datums: average water levels referenced to a 19-year period that NOAA calls the National Tidal Datum Epoch. The two Hilton Head stations recorded for only one to two months in 1979, so NOAA compared their readings with a long-term control station to derive equivalent values for the 1983 to 2001 epoch. They describe average tides and leave out storm surge, and the water at your lot can differ from the nearest station's.
What the site leaves out
The site doesn't publish ratings, customer quotes, project photos presented as anyone's work, or promises about price or schedule. Photos of real places credit the photographer. Images made with AI tools say "Illustrative image," and diagrams say "Illustrative concept."
When rules change
Dock rules in South Carolina do change. In October 2026, SCDES paused proposed changes to its dock regulations and said the current rules remain in effect. The agency itself changed in July 2024, when DHEC's environmental programs moved to SCDES. Before you rely on any rule here, confirm it with the agency that issues your permit.
To see the planning guides, go to the guides. To describe a project, send a request. For the structures and their tradeoffs, see docks, lifts, and shoreline work.
Send a request
This site publishes planning information and does not build docks. A request sent here goes to an independent local contractor, who may contact you about the project.
(843) 502-6361 Send a project requestTide ranges
- Mean tide range
- 6.10 ft
- Port Royal Plantation (8669167)
- Mean tide range
- 7.48 ft
- Broad Creek (8669338)
- Mean higher high to mean lower low water
- 6.78 ft
- Port Royal Plantation (8669167)
- Mean higher high to mean lower low water
- 8.11 ft
- Broad Creek (8669338)
Ranges in feet, from NOAA tidal datums for two former short-term tide stations on the island's waters, adjusted to the 1983 to 2001 epoch. Source: NOAA CO-OPS tidal datums (opens in a new tab), retrieved .
Planning a dock or boat lift?
Describe the property and what you have in mind. The request goes to an independent local dock contractor.
Areas covered: Hilton Head Island, Bluffton, Beaufort, Daufuskie Island, Okatie, Shelter Cove, Sea Pines, Palmetto Dunes, Shipyard Plantation, Windmill Harbour, Wexford Plantation, Long Cove.